Hello, dear client!
My name is Muhammad Umar, and I am your personal manager throughout your entire project. Please save my number so you can quickly reach me if needed. If I cannot answer immediately, I will call you back as soon as possible.
After the contract is signed:
Our engineer creates a technical sketch of the structure based on your preferences and the site measurements. I will send you the sketch for review and approval.
Important:
You may suggest necessary changes. Once you give final approval, the sketch is submitted to our engineering department for preparation of the official engineering plan and site plan.
Your task:
Carefully review and approve the sketch before it’s submitted for processing.
Warning:
No changes can be made after the sketch is approved.
Main documents include:
In some countries, additional documents may be required:
Documents That May Require Your Signature:
This document must be notary signed by the homeowner and registered with the County Clerk.
Permit Application:
In some counties, no signature from the homeowner is required at all
In others, the property owner may be required to sign using a simple digital signature (e.g., via DocuSign)
In specific cases, notarization may be required.
We will prepare and fill out all necessary documents on your behalf.
About the NOC Process
Your dedicated Permit Manager will guide you through the entire permit process. As we provide a Remote Online Notarization service (included in your package), notarizing required documents is easy.
We handle most of the work for your convenience:
With the help of our authorized notary partner, you can complete the process remotely using any device with audio and video capabilities such as a smartphone, tablet, or computer with a webcam.
Additional notes
The cost of additional documents is usually $500-700 and is paid separately. You will always be informed in advance if anything extra is required.
After the Engineering Plan and Site Plan Are Ready:
Our permitting department will prepare a complete document package and submit the permit application.
Your task:
Sign the required documents and, if necessary, arrange for the NOC registration. (We will assist you throughout this process).
I will inform you as soon as we receive any additional requests from the county.
Installation process:
Purpose:
After final inspection:
Internal procedures:
A few days after the permit application is submitted, we will install a branded project information stand at your site.
After the permit is approved:
Also:
Your task:
Installation process:
Notes:
Payments:
Your task:
After installation is finished:
Next:
Important:
If needed:
After successful inspection:
We kindly ask that you do not move or remove these documents until the inspection is completed.
In some counties, an additional final survey is required (cost ~$700–800).
Your Personal Manager Muhammad
Please save my number: +1 (239) 744-2122
I’m always available to answer your questions. If I can’t answer immediately, I’ll return your call shortly.