Call us (239) 544-5464
Jackie Kori

Hello, dear client!

greetings_alt

My name is Jackie Kori, and I am your personal manager throughout your entire project. Please save my number so you can quickly reach me if needed. If I cannot answer immediately, I will ll you back as soon as possible.

Key Points

01

All questions, coordination, and support go through your personal manager, Muhammad.

02

All stages of work and communication follow agreed-upon procedures.

03

There will be no additional charges without your approval.

04

We’ll stay with you until everything is finished and approved.

Detailed Description of the Project Stages

01
Preparation of Technical Documentation
After the contract is signed

Our engineer creates a technical sketch of the structure based on your preferences and the site measurements. I will send you the sketch for review and approval.

Important

You may suggest necessary changes. Once you give final approval, the sketch is submitted to our engineering department for preparation of the official engineering plan and site plan.

Your task

Carefully review and approve the sketch before it’s submitted for processing.

Warning

No changes can be made after the sketch is approved.

02
Permit Application
Main documents include
  • Engineering Plan
  • Site Plan
  • Proof of Ownership

 

Notice of Commencement (NOC) – must be notary signed by the homeowner and registered with the County Clerk.

In some counties, additional documents may be required
  • Boundary Survey
  • Certified Site Plan
  • Other permit-specific items
Documents That May Require Your Signature

Notice of Commencement (NOC)

 

This document must be notary signed by the homeowner and registered with the County Clerk.

Permit Application

In some counties, no signature from the homeowner is required at all.

 

In others, the property owner may be required to sign using a simple digital signature (e.g., via DocuSign).

 

In specific cases, notarization may be required.

 

We will prepare and fill out all necessary documents on your behalf.

About the NOC Process

Your dedicated Permit Manager will guide you through the entire permit process. As we provide a Remote Online Notarization service (included in your package), notarizing required documents is easy.

We handle most of the work for your convenience

We fill out the NOC form and send it to our trusted online notary partner.

 

You will receive instructions in advance. All you need to do is schedule a convenient time with the notary.

 

With the help of our authorized notary partner, you can complete the process remotely using any device with audio and video capabilities such as a smartphone, tablet, or computer with a webcam.

Additional notes

The cost of additional documents is usually $500-700 and is paid separately. You will always be informed in advance if anything extra is required.

After the Engineering Plan and Site Plan Are Ready

Our permitting department will prepare a complete document package and submit the permit application.

Your task

Sign the required documents and, if necessary, arrange for the NOC registration. (We will assist you throughout this process).

 

I will inform you as soon as we receive any additional requests from the county.

03
Placement of Project Information Stand
Installation process

The stand is placed near the main entrance to the property, in a visible area for inspectors.

 

It’s installed in a way that doesn’t obstruct passage or construction work. We ensure that it stays stable, secure, and clean.

Purpose

To provide quick inspector access to permit documents.

 

To streamline inspections and improve transparency on-site

After final inspection

The stand will be carefully removed from the site.

 

All documents will be packed and either handed to the owner or left in a safe place if you are not present.

Internal procedures

Your confirmation of stand placement is recorded in our CRM system.

 

A designated team member is responsible for coordinating the stand’s installation and removal.

 

A few days after the permit application is submitted, we will install a branded project information stand at your site.

04
Scheduling Installation
After the permit is approved

I will assign an installation crew for your project.

 

I will coordinate a convenient start date with you.

Also

The required amount of materials will be calculated.

 

Delivery of materials to the site will be arranged.

Your task

Confirm the start date and ensure access to the property.

05
Installation Work
Installation process

The structure is installed according to the approved engineering plan.

 

All key construction phases are monitored.

 

Quality control checks are performed regularly.

Notes

In case of bad weather work may be paused – you will be notified in advance.

 

If you have any questions or need to make decisions just contact me directly – I’m your personal manager.

Payments

Payments are made in stages according to the payment schedule in your contract.

Your task

Stay in touch during the process and be available for any approvals.

 

On the agreed date, the installation team will begin work on your property.

06
Final Inspection and Project Completion
After installation is finished

The crew will clean up the site, gather equipment and remove leftover materials.

Next

A permit specialist submits a request for final inspection.

Important

I will inform you in advance of the date and time of the inspection.

 

On the day of inspection, please ensure full access to the property: gates and doors must be open.

 

Please note: our installation crew will leave a sealed packet of inspection documents on the project.

If needed

If the inspector identifies any issues we will correct them and schedule a re-inspection.

After successful inspection

You will sign the Certificate of Completion.

 

The project is officially complete.

 

We kindly ask that you do not move or remove these documents until the inspection is completed.

 

In some counties, an additional final survey is required (cost ~$700-800).

07
Feedback
After successful completion, our service quality specialist will contact you to gather your feedback.

Why this matters?

 

We take every review seriously.

 

Your opinion helps us improve our service and create better experiences for future clients.

Reminder

01

All communications and actions go through your personal manager.

02

No extra costs will occur without your approval.

03

We support your project through completion, including inspections and final approval.

Jackie Kori
Jackie Kori
Project Manager, Screen Factory Florida
greetings-img Hi, I'm Jackie - your personal project manager. Save my number and reach me anytime throughout your project.

Whether you have a question about scheduling, materials, or inspections – I’m always available. If I can’t answer immediately, I’ll return your call shortly.

Name
Error
Phone
Error
Email
Error
Service Needed
Error
City
Error
Zip
Error
Address (Optional)
Error
Message (optional)
0/1000
Error
I have read and agree to the Privacy Policy and Terms of Service.